On the Critical Path

197122 dk
7.0
Belgesel

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path

On the Critical Path

197122 dk7.0 / 10

Konusu

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Nerede İzlenir?

Bu içerik şu anda Türkiye'deki dijital platformlarda mevcut değil.

Etiketler

nuclear powercandu

Hızlı Keşif

On the Critical Path filmini beğendiyseniz, 1971 yılının diğer yapımlarını, keşfedebilirsiniz.

Diğer Ülkelerdeki İsimleri

Industrie électronucléaire

Sık Sorulan Sorular

On the Critical Path filmi ne hakkında?

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plan

On the Critical Path filminin yönetmeni kim?

Yönetmen bilgisi mevcut değil.

On the Critical Path filmi hangi yıl vizyona girdi?

On the Critical Path filmi 1971 yılında vizyona girmiştir.

On the Critical Path sinema dünyasında konuşulan yapımlar arasına girmiştir. 1971 yılında vizyona giren bu Belgesel filmi, farklı zevklere hitap eden yapısıyla öne çıkmaktadır.

Konu ve Hikaye: Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited. 22 dakikalık film, bu hikayeyi sıkıştırılmış ve odaklı bir anlatımla aktarmaktadır.

Tür Özellikleri: On the Critical Path, anlatı çeşitliliğiyle seyirciye katmanlı bir deneyim sunan bir film olarak Belgesel kategorisinde öne çıkmaktadır. Sinema formatının sunduğu anlatı araçlarını verimli kullanan yapım, 1971 yılı film portföyünde kendine sağlam bir yer edinmiştir.

Prodüksiyon Detayları: 22 dakikalık metraj, hikayenin gerektirdiği ritimlere uygun biçimde kurgulanmıştır. Canada kökenli bu yapım, uluslararası dağıtım ağlarına taşınan, erişilebilirliği yüksek bir içeriktir.

Teknik Bilgiler: Süre: 22 dakika

Kimler İzlemeli? On the Critical Path, Belgesel türünü sevenler için öncelikli bir öneridir. Geniş bir izleyici yelpazesine seslenebilecek içerik yapısına sahiptir. Farklı yaş gruplarından izleyicilerin keyifle izleyebileceği bir içeriktir.

Sonuç: Belgesel türünde On the Critical Path, izlenebilirlik açısından değerlendirmeye alınmaya değer içerikler arasında yer almaktadır. Oyuncu kadrosu, fragman ve ilgili yapımlar hakkında ayrıntılı bilgiye bu sayfadan ulaşabilirsiniz.

Yorumlar (0)

Yorum yapmak için giriş yap.

Henüz yorum yok. İlk yorumu sen yap!

Veriler TMDB'den saglanmaktadir.

Son guncelleme: 18.09.2026 00:54:18